Wide Bay Training Area QLD
Terrequip was responsible for the construction and drainage of 22km of the new road including the extraction and processing of materials. As well as boat ramp design and construction.

Shoal Water Bay Training Area QLD
This project included the construction and drainage of 18km of fire trail including extraction and processing of materials. Construction and drainage of 15km of new road including the extraction and processing of materials. As well as erosion control and remediation over various sites.

 

 

 

 

 

 

 

 

 

 

Townsville Training Area QLD
This project included 20km of road remediation and drainage including the extraction and processing of materials.